Building Control Explained: What Every Homeowner in Thanet Needs to Know

← Back to all articles

Planning permission and Building Regulations are two separate systems — and confusing them is one of the most common (and costly) mistakes homeowners make. Here's how building control actually works.

Not the Same as Planning Permission

We get asked this constantly: "we don't need planning permission, so we don't need to tell the council anything, right?" Unfortunately, that's one of the most common — and expensive — misunderstandings in home improvement. Planning permission and Building Regulations are two entirely separate systems, run separately, and passing one says nothing about the other.

Planning permission is about whether you're allowed to build something — its size, appearance, and impact on neighbours and the local area. Building Control is about how it's actually built — whether it's structurally safe, properly insulated, fire-safe, adequately ventilated, and correctly connected to drainage and electrics. You can have full planning permission and still fall foul of Building Regulations if the construction itself doesn't meet the required standard — and building control sign-off is required on the vast majority of building projects, including many that never needed planning permission at all.

When Building Control Applies

As a general guide, Building Regulations approval is needed for:

If you're not sure whether your specific project needs it, the safest assumption is that it probably does — the list of exemptions is much shorter than the list of work that's covered.

Two Routes to Approval

You have a choice of who checks your work against the regulations:

Both routes carry the same legal weight and lead to the same outcome: a completion certificate confirming the work complies. Which one you use is usually a matter of cost, availability and how quickly they can turn around inspections — we can advise on this as part of any quote.

Building Notice vs Full Plans

For most domestic projects there are two ways to apply:

What Happens on Site

Once work is underway, your building control surveyor will inspect at defined stages — typically foundations before concrete is poured, damp-proofing, drainage before it's covered, and a final inspection on completion. Missing an inspection can mean digging back up work that's already been covered over, so on every job we build in the inspection points as fixed milestones rather than an afterthought.

Why Skipping It Is a False Economy

Work carried out without building control sign-off doesn't just carry a safety risk — it creates a legal and financial headache further down the line. Mortgage lenders and conveyancing solicitors routinely ask for completion certificates when a property is sold, and without one you may need to apply for retrospective approval, which can involve exposing finished work for inspection, at your cost, with no guarantee it will pass as-is.

Our Approach

On every extension, conversion or structural project we carry out across Margate, Ramsgate, Broadstairs and the rest of Thanet, building control is arranged as a standard part of the process — not an optional extra. If you're planning work and want to understand what approval route makes sense for your project, get in touch and we'll talk you through it before you commit to a design.

Need a Builder in Margate or Kent?

Get a free, no-obligation quote from Monarch Builders South East LTD. We respond within one business day.