Home charge point installation carried out by our own NICEIC-registered electricians, from consultation through to commissioning.
A poorly installed home charger is a fire and safety risk, not just an inconvenience — which is why it needs to be treated as the electrical installation it actually is.
We assess your existing consumer unit and incoming supply before recommending a charger, since not every property can simply have a 7kW unit added without upgrades elsewhere. Where the supply needs reinforcing, or the consumer unit needs a dedicated circuit adding, we do that work as part of the same job rather than leaving you to find a separate electrician afterwards.
Most of our installations are 7kW untethered or tethered wall units, mounted either on the house wall or a dedicated post where there's no suitable wall nearby. We handle the full process: site survey, DNO (electricity network) notification where required, installation, and commissioning.
If you're considering solar panels and battery storage as well, a charge point and a solar/battery system are often installed together, or planned with each other in mind — see our solar PV and battery storage page for more.
We check your consumer unit, cable route from the meter, and where the car will actually be parked before recommending anything.
Chargers are installed to the manufacturer's specification and current wiring regulations, with a dedicated circuit and appropriate earthing arrangement for the property.
Some installations need to be notified to your electricity network operator before or after work — we handle this so you don't have to work out which category your installation falls into.
You get full electrical certification for the installation, plus a walkthrough of how to use the charger and its app, if it has one.
We're steadily adding photos from completed EV Chargers jobs across Thanet & Kent. In the meantime, browse our full project gallery to see the standard of work behind every quote.
View Our ProjectsWe visit to check your electrics and agree where the charger will go.
A fixed quote covering the charger, installation and any consumer unit work needed.
Usually completed in a single day for a standard domestic installation.
The charger is tested, certified, and you're shown how it works before we leave.
Most can, but the answer depends on your existing electrical supply and consumer unit. We check this at the survey stage — occasionally a property needs a consumer unit upgrade, or less often a supply upgrade from the network operator, before a charger can be fitted safely.
Some installations need to be notified to your local Distribution Network Operator (DNO), either before or after installation, depending on the charger’s specification. We handle this notification as part of the job.
A standard domestic 7kW charger installation usually takes half a day to a full day, assuming no additional consumer unit or supply work is needed.
A tethered charger has the charging cable permanently attached; an untethered one has a socket that you plug your own cable into. It’s mostly personal preference, though untethered units are slightly more flexible if you might change car.
Tell us about your project and we'll come back to you within one business day.
Get a Free Quote